Flap gates
2003: Mobile threshold on left branch of the Tiber River
Positioning of three-section flap gate on left branch of Tiber River to regulate flow of the two branches toward the Tiber island.
Plant: ARDIS - Agenzia Regionale per la Difesa del Suolo - Rome
Dimensions: 40.00x0.90m
Hydrostatic head: 2.46m
Operation: Hydraulic (installed in dedicated lower duct)
Material: AISI 304
Notes: Stop logs can be installed on removable, intermediate columns
-
Flap gates
2003: Mobile threshold on left branch of the Tiber River
Positioning of three-section flap gate on left branch of Tiber River to regulate flow of the two branches toward the Tiber island.
Plant: ARDIS - Agenzia Regionale per la Difesa del Suolo - Rome
Dimensions: 40.00x0.90m
Hydrostatic head: 2.46m
Operation: Hydraulic (installed in dedicated lower duct)
Material: AISI 304
Notes: Stop logs can be installed on removable, intermediate columns
-
Flap gates
2003: Mobile threshold on left branch of the Tiber River
Positioning of three-section flap gate on left branch of Tiber River to regulate flow of the two branches toward the Tiber island.
Plant: ARDIS - Agenzia Regionale per la Difesa del Suolo - Rome
Dimensions: 40.00x0.90m
Hydrostatic head: 2.46m
Operation: Hydraulic (installed in dedicated lower duct)
Material: AISI 304
Notes: Stop logs can be installed on removable, intermediate columns
-
Flap gates
2003: Mobile threshold on left branch of the Tiber River
Positioning of three-section flap gate on left branch of Tiber River to regulate flow of the two branches toward the Tiber island.
Plant: ARDIS - Agenzia Regionale per la Difesa del Suolo - Rome
Dimensions: 40.00x0.90m
Hydrostatic head: 2.46m
Operation: Hydraulic (installed in dedicated lower duct)
Material: AISI 304
Notes: Stop logs can be installed on removable, intermediate columns
-
Flap gates
2003: Mobile threshold on left branch of the Tiber River
Positioning of three-section flap gate on left branch of Tiber River to regulate flow of the two branches toward the Tiber island.
Plant: ARDIS - Agenzia Regionale per la Difesa del Suolo - Rome
Dimensions: 40.00x0.90m
Hydrostatic head: 2.46m
Operation: Hydraulic (installed in dedicated lower duct)
Material: AISI 304
Notes: Stop logs can be installed on removable, intermediate columns
-
Flap gates
2001: Flap gate with counterweight
Plant: Hydroelectric Station Galliate (NO)
Dimensions: 7.10x3.00m
Hydrostatic head 3.40m
Operation: Hydraulic
Material: S355JR - Frame AISI 304
Notes: Hydraulic system with pneumatic accumulation units
-
Flap gates
2001: Flap gate with counterweight
Plant: Hydroelectric Station Galliate (NO)
Dimensions: 7.10x3.00m
Hydrostatic head 3.40m
Operation: Hydraulic
Material: S355JR - Frame AISI 304
Notes: Hydraulic system with pneumatic accumulation units
-
Flap gates
2005: Flap gates on lower lake of Fusine - Tarvisio (UD)
Plant: Skiarea Miara
Dimensions: No. 01 Opening 2.00x1.90m
Hydrostatic head: 2.55m
No. 01 Opening 0.70x0.70
Hydrostatic head 1.37m
Operation: Hydraulic
Material: S275JR - Frame AISI 304
-
Flap gates
2005: Flap gates on lower lake of Fusine - Tarvisio (UD)
Plant: Skiarea Miara
Dimensions: No. 01 Opening 2.00x1.90m
Hydrostatic head: 2.55m
No. 01 Opening 0.70x0.70
Hydrostatic head 1.37m
Operation: Hydraulic
Material: S275JR - Frame AISI 304
-
Flap gates
2005: Flap gates on lower lake of Fusine - Tarvisio (UD)
Plant: Skiarea Miara
Dimensions: No. 01 Opening 2.00x1.90m
Hydrostatic head: 2.55m
No. 01 Opening 0.70x0.70
Hydrostatic head 1.37m
Operation: Hydraulic
Material: S275JR - Frame AISI 304
-
Flap gates - Control Panel
2005: Flap gates on lower lake of Fusine - Tarvisio (UD)
Plant: Skiarea Miara
Dimensions: No. 01 Opening 2.00x1.90m
Hydrostatic head: 2.55m
No. 01 Opening 0.70x0.70
Hydrostatic head 1.37m
Operation: Hydraulic
Material: S275JR - Frame AISI 304
-
Flap gates - Hydraulic control unit
2005: Flap gates on lower lake of Fusine - Tarvisio (UD)
Plant: Skiarea Miara
Dimensions: No. 01 Opening 2.00x1.90m
Hydrostatic head: 2.55m
No. 01 Opening 0.70x0.70
Hydrostatic head 1.37m
Operation: Hydraulic
Material: S275JR - Frame AISI 304
-
Flap gates - During installation
2008/2009: Urago Hydroelectric Plant - Urago d'Oglio (BS)
Modernization of Hydroelectric Plant
Supply, installation and maintenance of hydraulic cut-off elements
-
Flap gates - Water intake
2008/2009: Urago Hydroelectric Plant - Urago d'Oglio (BS)
Modernization of Hydroelectric Plant
Supply, installation and maintenance of hydraulic cut-off elements
No. 03 Flap gates
Opening 11.50x2.00m
Hydrostatic head 3.00m
Including hydraulic control unit
-
Flap gates - Water intake
2008/2009: Urago Hydroelectric Plant - Urago d'Oglio (BS)
Modernization of Hydroelectric Plant
Supply, installation and maintenance of hydraulic cut-off elements
No. 02 Degravelling gates
Opening 5.00x2.15m
Hydrostatic head 3.00m
Including hydraulic control unit
-
Flap gate
2008/2009: Urago Hydroelectric Plant - Urago d'Oglio (BS)
Modernization of Hydroelectric Plant
Supply, installation and maintenance of hydraulic cut-off elements
|
|
|
|
|
« back to sluice gates
|
|
|
|
|
|